Finally I have machined a couple of the plastic parts I needed to assemble the robot and made a start on assembly. First I needed to move the milling machine from the old house (no small job) and get it set up.
These two images show the assembled progress versus the cad model of the whole assembly. I have made two of the custom plastic brackets for the AX-12 servos and have fitted them to the front left shoulder. There are two matching brackets required for each shoulder (click on these images for higher resolution).I've also done the angle bending on the top acrylic cover and used velcro patches to hold it on. I was very happy with how the bends came out, though the job is a lot simpler than the bending needed for the head. I was also happy with the machining on the shoulder brackets, though it was very tricky to do, involving a lot of planning ahead of how to best grip the part in the vice so it was held firmly enough. Took about 3 hours each for the two I've done so far, and there's 8 needed in total...
Just to check on how much weight he's gaining; the scales say 857 grams so far. The target weight for the whole robot including battery is around 2kg.
It's alive! :)
ReplyDeleteGood work mate, do you mind if I post the progress onto AusRobotics?
Thanks Ash, yes post away, no problem!
ReplyDelete